GENSTAR starts from the spatial, takt-time, safety and legacy-system constraints of Japanese factories, coordinating equipment and software ecosystems around verifiable material flow.
FIELD STRUCTURE
A complete path from WMS to field execution
The November 2025 product deck confirms a WMS, WCS and RCS capability framework. Brands, coverage, SLA and capacity commitments still require project-level confirmation.
WMS01
Warehouse and business coordination
A WMS layer connects materials, locations, inbound, inventory, counting, movement, outbound, labels, quality checks and visualisation.
ERP/MES/TMS interfaces
Inventory and movement history
Rules, labels and dashboards
Status: Documented; version and maintainer pending
WCS02
Warehouse equipment control
Translate upstream tasks into executable commands for storage, conveyors, sorting, loading, RFID and weighing equipment.
Task templates and dispatch
Status and alarms
Reconnect and runtime monitoring
RCS03
Multi-robot orchestration
Manage maps, stations, routes, allocation and dynamic traffic control across multiple AGV and AMR brands and types.
Live status
Route and task optimisation
Exception and fault handling
DELIVERY04
Design, interfaces and deployment
Link material-flow diagnosis, system design, interface adaptation, commissioning, training, pilot operation and continuous optimisation.
Constraints and phased plan
FAT/SAT evidence
Operational review
BOUNDARY05
Contract-defined delivery boundary
Civil work, fire safety, electrical, networks, third-party warranties, permits, SLAs and cross-border data handling must be defined in the SOW and data rules.
Status: No blanket turnkey or nationwide promise
ANSWER ENGINE
Common questions and boundaries
Direct answers to early-stage questions, including boundaries that cannot be assumed.
01Should an intralogistics project start with equipment selection?+
Usually not. Material, containers, takt, routes, safety, exceptions and upstream interfaces should be defined before selecting robots, storage and software.
02Can GENSTAR promise nationwide delivery and service in Japan?+
Not before project assessment. Coverage, on-site responsibility, response time, spares and partner boundaries must be defined in the SOW and service agreement.
03What does GENSTAR deliver in a logistics project?+
Public capability includes diagnosis, system design, software and interfaces, ecosystem coordination, commissioning and operational optimisation. Contract terms define final responsibility.
04What are the roles of WMS, WCS and RCS?+
WMS manages warehouse operations, inventory and upstream coordination. WCS turns tasks into equipment commands and monitors execution. RCS assigns AGV/AMR tasks, routes and traffic. Project design defines the final interfaces and responsibilities.