L-02 / INTRALOGISTICS

WCSWarehouse Control System

Convert upstream work instructions into executable commands for logistics, handling and sorting equipment while monitoring tasks and equipment status.

  • Task templates
  • Equipment coordination
  • Exception monitoring
Back to family catalogue
Warehouse Control System (WCS)

How one task reaches the shop floor

Configure task templates, transport orders and system interfaces, then send tasks to automated storage systems, RCS and other control systems. Task requests can originate from call stations, sensors, barcode readers, RFID, tablets and business systems.

Instruction sources, controls and execution targets

Business-system instructions

  • MES
  • WMS
  • DCS
  • Andon
  • Other business systems

Shop-floor inputs

  • Call boxes
  • Sensors
  • Barcode scanning
  • RFID
  • Tablets

WCS · task organisation

  • Configuration
  • Task templates
  • Material orders
  • Task management
  • Task monitoring
  • Exception monitoring

Equipment execution

  • Automated storage
  • Genstar RCS
  • Other vendors’ RCS
Task dispatchExecution feedback
Control-relationship schematic · not an operating screen

Business systems and on-site controls submit tasks to WCS; downstream systems execute in parallel and return results.

Business-system instructionsMES, WMS, DCS, Andon and other business systems issue tasks through system interfaces.

Shop-floor inputsCall stations and positioning blocks; production-line sensors, barcode readers and RFID; safety light curtains for loading, unloading and production robots; WMS/MES; and tablets.

Task orchestrationConfiguration, task templates, transport orders, task management, task monitoring and exception monitoring.

Equipment executionSend tasks to automated storage systems, Genstar RCS and third-party RCS platforms, then monitor execution results.

Connection exceptionsRaise automatic alarms for interface failures, reconnect offline peripheral equipment and display task-execution exceptions.

Five capabilities connecting tasks and equipment

Display task progress, equipment status and alarms. The system also supports priorities, shared-resource reservation and locking, task reassignment or operator intervention, operational traceability and reporting.

Five core modules and their functions

01

Equipment control and coordination

Connect AGVs, stacker cranes and other equipment through OPC-UA / Modbus TCP; decompose tasks into atomic equipment instructions; avoid equipment conflicts through dynamic path planning.

Equipment instructions / route coordination
02

Task scheduling and optimisation

Prioritise by urgency, distance and cost; reserve and lock shared resources; recover failed tasks through reassignment or operator intervention.

Priority
Distance and cost
Resource locking
Exception compensation
03

Live monitoring and fault response

Monitor equipment state and task progress in a 2D/3D overview, issue on-screen, audible, visual and message-based alerts, and use AI analysis to support predictive maintenance.

Equipment state
Task progress
Alarm response
04

System integration and data exchange

Exchange task instructions and execution results with WMS/MES, integrate with ERP/TMS, and support independent emergency operation while offline.

05

Data-based decision support

Store operational data in time-series and relational databases, generate KPI reports such as OEE and task-completion rate, and suggest process improvements for routes and storage locations.

Clear responses when exceptions occur

  • Interface failureAutomatic alarm
  • Device offlineAutomatic reconnection
  • Task exceptionReassignment / human intervention
NEXT STEP

Start by defining the operational challenge.

Share the current process, constraints and intended outcome. We will assess the smallest verifiable starting scope.

Discuss your challenge